Construction at the Science Library
Construction is scheduled to begin at theScience Libraryon Monday, June 1.
See all the steps below:
Monday, May 18 – Summer loan / Unlimited loan
Through July 17, borrow as many items as you like from the university library for the entire summer.
▼
Monday, June 1 – First floor closed
Materials in Room C (agriculture, medical sciences, zoology, botany, biology, paleontology, geology, environmental sciences), the study rooms, and the upper floor of the University Library will be unavailable until Monday, August 31.
▼
Monday, June 29 – The University Library will be completely closed
- The following collections are unavailable in Room A: astronomy, physics, chemistry, engineering, photography
-
The following materials are not available for open access: leisure collections (novels, comic books, general interest books, etc.), mathematics, computer science, methodology, languages, history of science, and epistemology.
Please visit the check-out/return desk to borrow these items, located at the entrance to the Science Library from 11 a.m. to 2 p.m., Monday through Friday (June 29–July 17 and August 24–28).
▼
Friday, July 17 – Summer closure
Monday, August 31 – Full reopening of the University Library
The other libraries in the network will remain open through July 17, and the standard lending service (reservation of materials) will continue.